First trigenerationsl installation of this scale in Poland – 2.2 MW cooling capacity, 2.8 MW of electricity and 3.12 MW of heat. Power plant was designed and constructed to meet the demand for energy around the Wrocław Technology Park area.
ZIELONA GÓRA SCIENCE CENTRE
NET delivered tree bed adsorption unit to the Center for Life Sciences with additional instrumentation and metering equipment allowing not only its commercial usage for the purposes of air conditioning but also for scientific research. Chiller produces chilled water at a constant parameter with less than 50% of a competitors electricity consumption. Energy supply is hot water from the district …
Share
HOLY FAMILY HOSPITAL IN WARSAW
Autonomous, reliable and redundant system produces electricity, heat and cooling for hospital needs. Allows complete independence from external electricity supply and 17% lower operating costs.
Share
UNIVERSITY CLINICAL HOSPITAL IN BIAŁYSTOK
An excellent and reliable cooling system based on district steam. Two absorption chillers with a total capacity of 2.32 MW consume only 24% of electricity compared to conventional solution based on a compressor chiller.
Share